The engineering office for cleanroom technology - Czech Engineering - was responsible for planning the 300m² cleanroom laboratory at Otto Bock Health Care, which was installed by Cleanroom Technology Austria.

Over a period of six months, I accompanied the assembly at Otto Bock with two time-lapse cameras. After completion in February 2016, I was able to conclude this extensive project with room photos and video recordings.

Cleanroom planning: www.czech.at
Cleanroom assembly: www.cta.at

Photos & Video: www.kito.at